McMinnville Honda

Automotive

project 01714 McMinnville Honda 1 exterior
project 01714 McMinnville Honda 2 exterior
project 01714 McMinnville Honda 3 interior
project 01714 McMinnville Honda 4 interior
project 01714 McMinnville Honda 5 interior

Meeting unique needs with strategic design.

This project comprised a remodel of an existing 4,800 sq. ft. service shop and the addition of an 11,300 sq. ft. two-story showroom and employee area. Because the site lacked connections to the city utilities, a 25,000-gallon tank was used to supply the fire sprinkler water to the building, while a new septic drainfield was strategically located to maximize the amount of parking available on the site. The building addition utilized CMU bearing walls and steel framing to create a modern facility, perfect for the team at McMinnville Honda.

Location: McMinnville, OR

Category: Automotive

Completed: 2017

Project Partners

  • MSC Engineers
  • Westech Engineering

The building addition utilized CMU bearing walls and steel framing to create a modern facility, perfect for the team at McMinnville Honda.